PROJECTS
OUR WORK
Full Range of Plants and packages for your oil and gas requirements which includes :
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/eni.png)
2006
Supply of Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2007
Pre Flash Heater Fire Tube Water Bath
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pol.png)
2007
High Pressure Fittings and Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2007
Supply of Pipe Fittings
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/eni.png)
2007
High Pressure Fittings
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2008
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2008
Pressure Control Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/omv.png)
2009
Polythene Sump
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
Indirect Line Heaters
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
High Pressure Fittings and Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/opl.png)
2009
Electrical Items
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
Supply of Line pipe 6” and 8”
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
150 KVA Generator
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Amine Sweetening Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Mud Pump Consumables
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Filter Elements and Carbon Filters
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Knock Out Drum
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Gas Chromatograph
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2011
Gas Processing Chemicals
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2011
Spares for Controller & Positioner
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ici.png)
2012
Safety Switches
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/engro-foods.png)
2012
Safety Switches
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Chemical Injection Package
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Casing Tubing
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Well head and X-mass Tree
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Well head Cooler
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Corrosion Inhibitor Pumps
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Valves for Infill Wells
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Amine Sweetening Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Hydro Carbon Dew point control unit
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
3 Phase Separator
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Compressor Package
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Gas Metering Skid
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
Supply of Actuator (PWI)
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
Supply of Winches (PWI)
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2019
Supply of Pipes, fittings, stud bolts etc to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Pulsation Dampner for Mud Pump to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of spares for Mud Pump Major Overhauling to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2020
supply of Refectory Material to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2021
Supply of Opening and Closing Piston To MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/engrovopak.png)
2021
Supply of Foot switch to Engro VoPak Terminal ltd
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Pumps for HPU and Rig Mari 3 to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Parts for Major Overhauling of Mud Pump to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Draw Works Gear Box Overhauling Parts to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Draw Works Major Overhauling parts to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Fluid End parts for Rig Mari 3 to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2021
Supply of Gaskets to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2021
Supply of Sealing Element for BOP to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2021
OUR WORK
Full Range of Plants and packages for your oil and gas requirements which includes :
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/eni.png)
2006
Supply of Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2008
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/opl.png)
2009
Electrical Items
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Filter Elements and Carbon Filters
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ici.png)
2012
Safety Switches
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Well head Cooler
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Hydro Carbon Dew point control unit
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Pumps for HPU and Rig Mari 3 to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2007
Pre Flash Heater Fire Tube Water Bath
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2008
Pressure Control Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
Supply of Line pipe 6” and 8”
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Knock Out Drum
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/engro-foods.png)
2012
Safety Switches
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Corrosion Inhibitor Pumps
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Parts for Major Overhauling of Mud Pump to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pol.png)
2007
High Pressure Fittings and Valves
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/omv.png)
2009
Polythene Sump
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
150 KVA Generator
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Gas Chromatograph
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Chemical Injection Package
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Valves for Infill Wells
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
3 Phase Separator
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
Supply of Actuator
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Draw Works Gear Box Overhauling Parts to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2007
Supply of Pipe Fittings
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
Indirect Line Heaters
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Amine Sweetening Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2011
Gas Processing Chemicals
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Casing Tubing
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Dehydration Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Compressor Package
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Draw Works Major Overhauling parts to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of spares for Mud Pump Major Overhauling to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2010
Mud Pump Consumables
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Amine Sweetening Plant
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/pgnig.png)
2013
Gas Metering Skid
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Fluid End parts for Rig Mari 3 to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2021
Supply of Sealing Element for BOP to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/04/Pakistan-Welding-Institute-PWI.png)
2019
Supply of Winches
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2021
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2020
supply of Refectory Material to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2020
Supply of Pulsation Dampner for Mud Pump to MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2011
Spares for Controller & Positioner
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2012
Well head and X-mass Tree
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2019
Supply of Pipes, fittings, stud bolts etc to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2021
Supply of Foot switch to Engro VoPak Terminal ltd
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/eni.png)
2007
High Pressure Fittings
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mpcl.png)
2021
Supply of Opening and Closing Piston To MPCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/ogdcl1-1.png)
2021
Supply of Gaskets to OGDCL
![](https://www.petrotec.com.pk/wp-content/uploads/2021/03/mgcl.png)
2009
High Pressure Fittings and Valves